A number of challenges presented. Concrete stairs dimensions were too high and wouldn’t allow for the marble to run flush with the upstairs flooring. The concrete steps has to be brought back a few millimeter on each step to ensure continuity in riser height maintaining a flush finish with the timber flooring on first floor.
The stringer could not be machined in two individual pieces due to the curvature of the stairs, so we created multiple pieces and used techniques to bring the eye away from the joints.
The project ran over schedule, due to Covid-19 restrictions, but the end result was worth it.